Product Detail :
|
division hospete(hpt)-vyasa colony(vc)-swamihalli(smli) section construction of rcc side drains between hospete(hpt)-vyasa colony(vc) section @ km 1/600-17/900 & vysa colony(vc)-swamihalli(smli) section @ km 10/00-12/00 - total length of 4.30 km. (maintenance period-03 months)
|