The project involves the establishment of a 2x20 MVA, 66/11kV substation at Kumbenahally, along with the construction of a 66kV LILO line on 110kV DC towers using Coyote conductor, extending approximately 0.07 km from one circuit of the 66kV Yachenahally-Singapura-Kadavinkote DC line to the proposed Kumbenahally substation. Station Supply Portion, Line Supply Portion, Station Mandatory Spares, Station Erection Portion, Line Erection Portion, Station Civil Portion, Line Civil Portion
|
| Tender Detail : |
The project involves the establishment of a 2x20 MVA, 66/11kV substation at Kumbenahally, along with the construction of a 66kV LILO line on 110kV DC towers using Coyote conductor, extending approximately 0.07 km from one circuit of the 66kV Yachenahally-Singapura-Kadavinkote DC line to the proposed Kumbenahally substation. |