|
Product Detail :
|
SW-I Name of work- Hubballi Division - LD-VSG Section Construction of RUB in
lieu of LC No. 06@KM 10/200-300 in between LD-TGT station respectively by BOX
pushing method. SW-II Name of work - Hubballi Division- LD-VSG section
construction of RUB in lieu of LC No. 07 @KM12/0-100 in TGT Yard respectively by
BOX pushing method. .(Maintenance period-12 Months).Two Packets System.
|
| Tender Detail : |
SW-I Name of work:- Hubballi Division :- LD-VSG Section: Construction of RUB in
lieu of LC No. 06@KM 10/200-300 in between LD-TGT station respectively by BOX
pushing method. SW-II Name of work :- Hubballi Division:- LD-VSG section:
construction of RUB in lieu of LC No. 07 @KM12/0-100 in TGT Yard respectively by
BOX pushing method. .(Maintenance period-12 Months).Two Packets System. |